| The Process |
 Owners decide what the project
will be in general |
 Owners make a rough drawing,
with dimensions |
 and meets with AGS employees
to work on details and stone selection |
 Owners will select sink or
other fixtures, as needed, before the template is
prepared |
 AGS makes a wooden template of
the project. |
 Countertops may remain off
until stone is installed |
 AGS takes the plumbing
fixtures with the template back to the shop |
 Template is secured to stone
where rough cuts are made to section major parts. |
 A large section is rough cut
and put aside |
 The seam must be precise and it will take some time,
effort, and expertise |
 Finishing the seam edge |
 Edging machine is configured |
 Edging is done per design
plan. Many edges are available at AGS. |
 The template for the sink is
set up and material removal begins |
 The sink hole is
ready. |
 The truck and technicians
arrive |
 The components go into the
home |
 The sink has to go in before
the countertop if it is to be mounted beneath the
countertop |
 The first countertop goes on
the cabinet |
 Fine tuning is being done in
the driveway |
 The second countertop is
installed |
 This is definitely a two man
job |
 The seam is tightened so it is
nearly transparent |
 The sink is
connected |

Final product: pass-through from dining
room side |

Final product: kitchen view from sink
area |

Final product: Sink and largest countertop.
Simple kitchen "souped up" |

Final product: small countertop |