The Process

Owners decide what the project will be in general

Owners make a rough drawing, with dimensions

and meets with AGS employees to work on details and stone selection

Owners will select sink or other fixtures, as needed, before the template is prepared

AGS makes a wooden template of the project.

Countertops may remain off until stone is installed

AGS takes the plumbing fixtures with the template back to the shop

Template is secured to stone where rough cuts are made to section major parts.

A large section is rough cut and put aside

The seam must be precise and it will take some time, effort, and expertise

Finishing the seam edge

Edging machine is configured

Edging is done per design plan.  Many edges are available at AGS.

The template for the sink is set up and material removal begins

The sink hole is ready.

The truck and technicians arrive

The components go into the home

The sink has to go in before the countertop if it is to be mounted beneath the countertop

The first countertop goes on the cabinet

Fine tuning is being done in the driveway

The second countertop is installed

This is definitely a two man job

The seam is tightened so it is nearly transparent

The sink is connected
final_passthrough.jpg (110104 bytes)
Final product:  pass-through from dining room side
final_opposite.jpg (159515 bytes)
Final product:  kitchen view from sink area
final_large.jpg (121694 bytes)
Final product:  Sink and largest countertop.  Simple kitchen "souped up"
final_sidesection.jpg (129269 bytes)
Final product:  small countertop

 

|  Home  | Stone  | Sinks  | Gallery  | The Process  | FAQ  | Testimonials  | Contact us  | Links  |